E&I Installation and Commissioning

Project Phoenix

Full Electrical and Instrumentation installation complete with commissioning support to Aston DaneWorks carried out included 500mts of HD ladder racking.

Manchester Airport Station 3rd Platform

Cross Services Engineering Limited (CSEL) were appointed by Carillion/ Alfred McAlpine as the M&E Design & Installation Contractor for the new Third platform at Manchester Airport Station.

Download the case study (PDF) here

Mersey Rail Sandhills Station

Cross Services Engineering Limited (CSEL) were appointed by Murphy's as the M&E Contractor at Sandhills station.

Download the case study (PDF) here

Edge Hill - Alstom Virgin Pendelino Depot

Cross Services were appointed as
M&E Design & Build contractor on this
exciting new project.

Download the case study (PDF) here